Q17: How soon can traffic be opened after construction?

A: After 7 days of curing and if a sealing layer has been applied, traffic can be opened once the sealing layer is dry. If no sealing layer is applied, light traffic may be allowed after the curing period, but heavy loads should be limited initially.